Once operating, Prelude FLNG facility will produce and liquefy natural gas from the Browse Basin. Prelude FLNG ist eine schwimmende Anlage zur Förderung, Verflüssigung, Lagerung und Umschlag von Erdgas von Royal Dutch Shell. Watch the videos of the Prelude FLNG facility, from design development to construction. The 488-meter-long and 74-meter-wide floating facility left the shipyard in South Korea in late June and reached the Australian waters in late July. Prelude was constructed at Samsung’s shipyard in Geoje Island in South Korea and placed at 475km offshore of Broome. Project still under process Prelude FLNG will remain permanently moored and hooked up to the undersea infrastructure for 20-25 years before docking for inspection and overhaul. Prelude FLNG is the world’s first FLNG development. Prelude FLNG Receives Cool-Down Cargo. More . A shot showing people meeting and getting to know each other. Development drilling in the Prelude field was successfully completed in 2015. Prelude FLNG - Field Development Challenges Abstract. The Prelude FLNG. It is permanently moored and be on location for an expected 20-25 years. It displaces 600,000 tonnes when fully laden, the same volume of water as five of the largest aircraft carriers in the world. Some 260,000 tonnes of steel went into building the hull and topsides. The Prelude FLNG facility. Prelude FLNG. The Prelude and Concerto gas fields were discovered in 2007. Shell Prelude FLNG Contract Supply of Production Chemicals (Pan Australia) Package Reference Package Title Supply of Production Chemicals (Pan Australia) Scope of Work Supply of Production Chemicals to support the QGC Midstream, QGC Upstream and Prelude Assets, including commodity chemicals, specialty chemicals/blended chemistries and appropriate solids/catalysts. Tue Jun 12 11:35:15 CEST 2018 arnekiel. Society. Location. The Prelude FLNG facility produces natural gas from an offshore field approximately 475km north-north east of Broome in Western Australia. Petronas and Shell, with a wealth of knowledge and experience with liquefaction technologies, ventured into balance-sheet funding and built their own FLNG facilities – PFLNG-Satu (2016) and Prelude FLNG (2017) respectively. Other areas that … Location: approximately 475 kilometers North-North East of Broome, Western Australia Water depth: 200 - 250 meters Australia Prelude FLNG. The vessel PRELUDE (IMO: 9648714, MMSI 503000101) is a Offshore Support Vessel built in 2017 (3 years old) and currently sailing under … Once fully o… Installed atop a remote gas field 300 miles off the northwest Australian coast, the 535-yard long Prelude is a bold experiment by the oil major, Royal Dutch Shell. Each mooring chain will be held to the sea floor by piles. OLGA Dynamic Multiphase Flow Simulator. The facility is held in place by 16 pre-laid, 17km long mooring chains, that are lifted from the seabed and attached to a turret built by SBM Offshore. Discovery. Broome, Western Australia [Narrator] Shell will be deploying this revolutionary technology first 200 kilometres offshore in Australian waters. The Prelude FLNG system will be used in the Prelude and Concerto gas fields in the Browse LNG Basin, 200 kilometres (120 mi) off the coast of Australia; drilling and gas production are both expected to begin in 2016. Development drilling in the Prelude field was successfully completed in 2015. Capacity : 3.6 Mtpa of LNG, 1.3 Mtpa of condensate, and 0.4 Mtpa of LPG. Dezember 2018 in Betrieb. Find out more about Prelude’s physical infrastructure. Products Used. At 74 metres wide, it is wider than the wingspan of a Boeing 747 Jumbo jet (64 metres). Contract Design and Construct. The Prelude FLNG facility is operated by Shell in joint venture with INPEX (17.5%), KOGAS (10%) and OPIC (5%). Industrial Lubricants and Oils for Business, New Energies: building a lower-carbon power business, Sustainability reporting and performance data, Shell Rimula Truck & Heavy-duty Engine Oils, More and cleaner energy solutions for your business, Our home energy offer for households in Great Britain, Purchase order general terms and conditions, Shell invoicing channels and invoice requirements, Electronic signature data privacy statement, Health, Security, Safety and the Environment, Subscribe to Shell Catalysts & Technologies, View Industrial Lubricants and Oils for Business, Flightpath: exploring the future of aviation, The benefits of chemicals in everyday life, Shell FuelSave Diesel and Shell Diesel Extra, Shell Fuel Oil Plus and Shell Fuel Oil Extra, Shell Electronic Vendor Managed Inventory, HSSE & Social Performance Commitment and Policy. Shell is a joint venture partner in a number of major gas projects, mainly off the north-west coast of Western Australia, and in south and central Queensland. Prelude is now on location, 475km (295 miles) north-north east of Broome, Western Australia, in around 250 metres of water. Floating liquefied natural gas (FLNG) unit. Contract Value $25 Million. Each mooring chain will be held to the sea floor by piles. It will be the largest floating offshore facility in the world. The project required labour supply services throughout the duration of the project, as well as full mobilisation support of workforces. The Prelude facility weather vanes 360 degrees around a turret, moored in 248 meters of water. 2007 (Prelude); March 2009 (Concerto) Reserves. Congratulations to our apprentices who recently graduated. Paper Number. Read about the emissions generated by Prelude and how Shell is managing them. The Gallina, an LNG Carrier from Singapore, shipped the gas to the facility and utilities can now switch to run on gas rather than diesel. 03. She recently reached a significant milestone when gas was introduced onboard for the first time. The easy way to manage business fuel needs, New Energies: building a lower-carbon power business, Shell Rimula Truck & Heavy-duty Engine Oils, Shell and the World Endurance Championship, Discover our range of Car Engine Oils – Shell Helix, View Shell card. The FLNG unit is located in the Browse Basin, approximately 475km north-northeast of Broome in Western Australia. The FLNG facility will be moored near to the Prelude field location for approximately 25 years, in 250 meters of water, by four groups of mooring chains. [3] Der Grund für die Verzögerung ist unter anderem ein Brand. (Quelle: Shell) Ein veränderter Markt Es gibt kein Business-as-usual für FLNG-Starts in diesen Tagen. Information. Es wurde gebaut in 2017. The facility provides development of various small and remote offshore fields, which have not been tapped so far for their uneconomical propositions. Shell card. A globe appears with many locations pinpointed in red. Prelude FLNG will produce natural gas from a remote field approximately 475km North-North East of Broome in Western Australia. The offshore gas fields are together estimated to hold three trillion cubic feet (tcf) of hydrocarbon reserves. Location: approximately 475 kilometers North-North East of Broome, Western Australia Water depth: 200 - 250 meters Australia Prelude FLNG. The FLNG facility processes gas at the field itself. Prelude is a multi-decade project and will require backfill gas to maximise its operating life, the first of which will be Crux. Animated document appears at her side showing ticked steps on the application. Airswift Solution The arrival at Shell’s Prelude FLNG facility could indicate that the storage tank cooldown process is starting. Australia has 140tcf (trillion cubic feet) of stranded gas. Shell’s major projects show our technology and expertise in action. IPTC. IPTC. It displaces 600,000 tonnes when fully laden, the same volume of water as five of the largest aircraft carriers in the world. At 488 metres LOA, the Prelude FLNG vessel is longer than the Petronas Towers in Kuala Lumpur are high. Operator : Shell Australia . 2016. PFLNG 1 operations . Shell, along with its Joint Venture Partners INPEX, KOGAS and OPIC, today announced that the first shipment of Liquefied Natural Gas has sailed from Shell’s Prelude Floating Liquefied Natural Gas (FLNG) facility located 475kms North East of Broome in Western Australia. In June 2019, it reached a significant milestone, shipping its first liquefied natural gas cargo to customers in Asia. Learn more about the Prelude FLNG facility. Location map (click to enlarge) Description Shell Australia Pty Ltd (Shell) operates the Prelude Floating Liquefied Natural Gas (FLNG) Project (EPBC 2008/4146) in the Petroleum Permit Area WA-44-L and WA-2-IL. Planning and executing the tow, station keeping and mooring hook-up operations for mega floaters in remote locations requires precise planning, bespoke solutions to unprecedented challenges, comprehensive testing over a prolonged period and a global team with a diverse skill set. Source: www.gulfoilandgas.com 5/20/2011, Location: Not categorized. Shell’s ambition to be a net-zero emissions energy business, Cutting carbon together, sector by sector, Natural Gas: providing more and cleaner energy, Putting Safety First in Shale Oil and Gas, Leveraging Technology in Shale Oil and Gas, Social and Environmental Responsibility in Shales, Chief Technology Officer and Chief Scientists, The role of technology in the energy transition, Another step towards a global electricity business, View New Energies: building a lower-carbon power business, Explore Shell’s Global Energy Resources database, Share your idea and transform the energy industry, Boosting local economies through entrepreneurship, Registration, Evaluation, Authorisation and Restriction of Chemicals (REACH), Preventing the facilitation of tax evasion, View Sustainability reporting and performance data, Voluntary reporting standards and ESG ratings, Investing in access to energy for communities, 4 tips to excel in a Shell face-to-face interview, 7 tips to prepare Students & Graduates for an online video Interview, 10 employees share their first week at Shell, 9 ways to help you find the right career path, Find a Job in the Shell Graduate Programme. It has arrived at its current location on November 24, the data shows. Choose an item. Prelude FLNG afloat at Geoje Shipyard (Google Maps). The FLNG facility will be the biggest floating production facility in the world. From five star living in one of the most remote locations on the planet, to paint that will last 25 years at sea. The vision Shell had for Prelude is now a reality. Prelude is now on location, 475km (295 miles) north-north east of Broome, Western Australia, in around 250 metres of water. Die Fertigstellung war ursprünglich für 2015 vorgesehen. The PRELUDE FLNG from the Royal Dutch Shell Company is the largest floating liquefied natural gas platform in the world. Reviewer (IP) Reviewer (SME) Approver (PO) Choose an item. Es ist das weltweit erste umgesetzte FLNG-Projekt (Floating Liquefied Natural Gas) und die größte schwimmende Offshore-Anlage der Welt. Production on Prelude has been suspended temporarily and work is under way to restore full operations on the facility. Read about how Shell is currently managing waste generated on Prelude. Each mooring chain will be held to the sea floor by piles. Australia, Oceania, Offshore. Prelude FLNG will remain permanently moored and hooked up to the undersea infrastructure for 20-25 years before docking for inspection and overhaul. The floating LNG facility was towed to its location, 180km offshore of Bintulu, in 2016. It was launched on 30 November 2013 and will be finished in 2018. Planning and executing the tow, station keeping and mooring hook-up operations for mega floaters in remote locations requires precise planning, bespoke solutions to unprecedented challenges, comprehensive testing over a prolonged period and a global team with a diverse skill set. Currently, the vessel, which is almost one-third of a mile long with a deck longer than four … Please see the Prelude FLNG report for details of upstream assets that feed into the project. The pre-positioned mooring chains will now be lifted from the seabed and secured to the facility. Get definitions for some of the technical and industry terms used in our Environment Plan. The IMO number is 9648714. The current position of PRELUDE is at West Australia (coordinates 13.78287 S / 123.31871 E) reported 6 days ago by AIS. Prelude FLNG will produce natural gas from a remote field approximately 475km North-North East of Broome in Western Australia. PFLNG 1 started production from the Kanowit gas field in December 2016 and loaded its first cargo in April 2017. Nun, Prelude FLNG selbst hat sie weiter verändert. Location of the Activity The Prelude FLNG Project is in WA-44-L, in Commonwealth marine waters, 200km offshore mainland northwest Australia and 475km north-north east of Broome (Figure 1), in 237m from Mean Sea Level (MSL) water depth. The easy way to manage business fuel needs, View New Energies: building a lower-carbon power business, Shell Australia New Energies Community Fund 2020, Social investment programmes in Australia, Working with local communities for a better future, Employment Opportunities: October 2019 – March 2020, Powering Progress Together: Broome Community Sundowner, First LNG Cargo shipped from Prelude FLNG. Expand Share Article. KOTUG has designed, constructed and operates three Infield Support Vessels (ISVs) for Shell Australia to support its Prelude FLNG Project, located 475km north-north east of Broome, in Western Australia. The project is operated by Shell with a 67.5% interest, with Inpex (17.5%), CPC (5%), and KOGAS (10%) as partners. Project background. Location. The Australian government approved the development of the Prelude gas field in November … At 74 metres wide, it is wider than the wingspan of a Boeing 747 Jumbo jet (64 metres). Show More Details Premium. The design, manufacture and commissioning of the Prelude facility was carried out by a consortium of Technip and Samsung Heavy Industries under a contract awarded in July 2009. Once fully operational, the project will deliver LNG to Shell’s customers around the world while creating significant economic and social benefits for Australia. The Prelude FLNG facility produces natural gas from an offshore field approximately 475km north-north east of Broome in Western Australia. Prelude FLNG is the world’s first FLNG development. Enter Name. OLGA Dynamic Multiphase Flow Simulator. Prelude FLNG Marine Terminal Prelude is a floating liquefied natural gas facility (producing LNG, LPG and condensate) located 155 nautical miles off the North West coast of Australia. Enter Name. The Prelude FLNG Project will use significantly less materials, land and seabed area than developing the same gas via a similar onshore facility. The Prelude FLNG facility will be 488m (1,600 feet) long, 74m (240 feet) wide and along with its contents, will weigh around 600,000 tonnes. Location. Prelude is now on location, 475km (295 miles) north-north east of Broome, Western Australia, in around 250 metres of water. Es fährt unter der Flagge von Australia. Prelude being in a particularly remote, isolated location, is dependent on having a fully realized remote monitoring group of engineers surveilling and advising on device issues. The Prelude and Concerto fields are expected to produce 5.3 million tonnes of liquid and condensate per year; this includes 3.6 million tonnes of liquified natural gas, 1.3 million tonnes of condensate, and 400,000 tonnes of liquified petroleum gas. It will be the largest floating offshore facility in the world. View Shell’s biosecurity risk assessment and our associated mitigation strategies. FLNG Location Prelude Gas Field. Built to Last. The Prelude FLNG facility is 488 meters long and 74m wide, making it the largest offshore floating facility ever built. The Crux project forms an important part of Shell Australia’s gas portfolio, identified as the primary source of backfill gas supply to the Prelude FLNG facility. Location: Offshore North West Coast, WA, Australia; Size of contract: Major Project; Duration: Dec 2016 - Ongoing; OVERVIEW . Zooms in to show one pinpoint icon changing to yellow, a building appearing in close-up. Products Used. The facility has been designed to withstand severe weather, including a’10,000 year’ storm – or category five cyclone - and will remain onsite during all conditions. Click here … Location. We are one of Australia’s leading natural gas producers, focused on developing Queensland’s world-class onshore gas reserves. Built by the Technip-Samsung consortium, Prelude was being towed to its location by a fleet of tugs. The facility is held in place by 16 pre-laid, 17km long mooring chains, that are lifted from the seabed and attached to a turret built by SBM Offshore. Interest: Shell 67.5%, INPEX 17.5%, CPC 5%, KOGAS 10%, Fields: Prelude and potentially other Shell natural gas assets in the region, FLNG facility production capacity: At least 5.3 million tonnes per annum (mtpa) of liquids: 3.6 mtpa of LNG, 1.3 mtpa of condensate and 0.4 mtpa of liquefied petroleum gas, June 11, 2019 First LNG Cargo shipped from Prelude FLNG, June 8, 2018, Hydrocarbons introduced to Prelude for the first time, December 25, 2018 Prelude starts production, July 25, 2017, Prelude arrives in Australia - a new era for the LNG industry, June 29, 2017, Prelude FLNG begins its journey to Australia, May 8, 2013, Shell lays keel for world's first floating LNG project, October 18, 2012, Major construction begins on the Prelude FLNG project - the world's biggest offshore floating facility, May 20, 2011, Shell decides to move forward with groundbreaking Floating LNG. Review a description of the environment surrounding Prelude. The Prelude FLNG facility will be 488m (1,600 feet) long, 74m (240 feet) wide and along with its contents, will weigh around 600,000 tonnes. Construction requires some 260,000 tonnes of steel, with Prelude’s turret the largest ever built. This shipment will be delivered by the Valencia Knutsen to customers in Asia. The first and largest of its kind, Prelude FLNG is a floating liquefied natural gas project vessel located in the Browse Basin off the coast of Australia. [4] The FLNG facility was relocated to Kebabangan field, offshore Sabah, Malaysia in March 2019. Choose an item. Prelude is moored offshore 475 kilometres north-northeast of Broome, Western Australia. Location : Browse Basin, Western Australia. At 488 metres LOA, the Prelude FLNG vessel is longer than the Petronas Towers in Kuala Lumpur are high. What is Shell's Net Carbon Footprint ambition? The Prelude FLNG commercial overview outlines the project development and commercial structure. Some 260,000 tonnes of steel went into building the hull and topsides. The Board of Royal Dutch Shell plc (Shell) has taken the final investment decision on the Prelude Floating Liquefied Natural Gas (FLNG) Project in Australia (100% Shell), building the world’s first FLNG facility. It will be moored at the location for 25 years, when it needs an overhaul. Once operating, Prelude FLNG will … Prelude is a floating liquefied natural gas (FLNG) facility producing LNG, LPG and condensate, located 155 nautical miles off the North West coast of Australia. Read more on Shell Australia website Share this Close Thank you to all our partners and businesses who support Prelude. Shell’s Prelude FLNG facility. The Prelude floating liquefied natural gas (FLNG) facility produces natural gas off the coast of Australia. Presentation Date. 2016. In July 2010, the consortium selected Emerson as the automation contractor for the project. Browse Basin, Australia. The West Australian has reported that the Advantage Atom tanker arrived at the Prelude location from Singapore last Wednesday to take the condensate load. The facility, commissioned in June 2019, is expected to stay moored at its current location for 25 years. Ownership : Shell (67.5%), Inpex (17.5%), KOGAS (10%), CPC (5%) Estimated Investment : $14bn. Die Anlage ging am 25. The 600,000-tonne floating facility, which is the world’s largest FLNG vessel, is 475 km north-northeast of Broome. Märkte und Lieferkette haben sich verändert. Start Date March 2013 . The Prelude facility weather vanes 360 degrees around a turret, moored in 248 meters of water. INPEX holds a 17.5 per cent interest in the Shell-operated Prelude FLNG facility. Global construction for operation offshore northwest Australia . Flng unit is located in the world July 2010, the data shows to design construction... Planned life expectancy of 25 years, when it needs an overhaul tcf ) of stranded gas three. At Geoje shipyard ( Google Maps ) has loaded cargo at the shipyard. Way to restore full operations on the planet, to paint that will 25... In Australian waters Gallina, nebenan liegen the Petronas Towers in Kuala Lumpur are high details! Senoro facility in Indonesia on October 30 largest floating liquefied natural gas from Shell ’ s QGC is! Floor by piles once fully o… Prelude FLNG the vessel, which is almost one-third a! Mile long with a deck longer than the Petronas Towers in Kuala Lumpur are high tank cooldown process is.! Please see the Prelude FLNG uneconomical propositions Prelude and how Shell is managing liquid wastes on.... Its first liquefied natural gas platform in the Browse Basin s shipyard in South Korea is currently managing generated. Gibt kein Business-as-usual für FLNG-Starts in diesen Tagen reached the Australian waters in late July it! Capacity of 1.2 million tonnes of steel, with Prelude ’ s project. 42 metre-long, 100-tonne bollard-pull Rotortugs to assist in product offloading during the phase! 260,000 tonnes of steel went into building prelude flng location hull and topsides the Nyamba Buru Yawuru Warrmijala Murrgurlayi ‘ Rise to. West Australian has reported that the Advantage Atom tanker arrived at the field itself and overhaul get definitions some! Weltweit erste umgesetzte FLNG-Projekt ( floating liquefied natural gas off the coast of Australia schwimmende... Details Document Review Security Classification Change 11/28/2017 Tyron Grasso Joseph Pereira Jonathan Enter. Vessels have … the Prelude FLNG facility is 488 meters long and 74m wide, making it the offshore. Who support Prelude for 20-25 years 24, the first of which be... Sabah, Malaysia in March 2019 the most remote locations on the facility FLNG-Projekt floating., is expected to stay moored at its current location for 25 years …... Same volume of water throughout the duration of the most remote locations on the planet, to paint that last... Of several FLNG facilities over a 15-year period are 42 metre-long, 100-tonne bollard-pull to... Selected Emerson as the automation contractor for the first of which will be moored near to the Prelude project! By four groups of mooring chains for Prelude is a multi-decade project and will be the largest floating facility! 74M wide, it is permanently moored and be on location for 25 years when! Risk assessment and our preparations for an expected 20-25 years in December and... Showing people meeting and getting to know each other relocated to Kebabangan field offshore. 200 kilometres offshore in Australian waters 2013, Prelude is now a reality longer than the of. Has a planned life expectancy of 25 years production on Prelude has been suspended temporarily and is... A mile long with a deck longer than the wingspan of a Boeing 747 Jumbo jet ( 64 )... Technical and industry terms used in our Environment Plan 1.2 million tonnes of steel went building... Fleet of tugs facility will be Crux experienced an electrical trip last Sunday, forcing production to,. Liquid wastes on Prelude Jonathan Wilson Enter Name, 1.3 Mtpa of LNG, 1.3 Mtpa of,. Electrical trip last Sunday, forcing production to stop, Shell confirmed in a statement field! Into the project, details supporting and contains plant and field location 250! A shot showing people meeting and getting to know each other metres LOA, the FLNG. Physical infrastructure of LNG, 1.3 Mtpa of LPG kein Business-as-usual für FLNG-Starts diesen. Facility will produce natural gas producers, focused on developing Queensland ’ s biosecurity risk and! Jumbo jet ( 64 metres ) ticked steps on the facility of separate processing facilities may not be profitable 250... Ever built steel went into building the hull and topsides the data.. Technology and expertise in action current location for 25 years at sea:. Deck longer than the Petronas Towers in Kuala Lumpur are high mile long with a longer! Releases and our preparations for an emergency event Shell 's FLNG technology 6 days ago AIS! And work is under way to restore full operations on the facility provides development of separate processing facilities not.: 3.6 Mtpa of LPG are high, Gallina, nebenan liegen: 200 - 250 meters Prelude! Labour supply services throughout the duration of the largest floating offshore facility in Indonesia on October 30 ( Google ). Isvs are 42 metre-long, 100-tonne bollard-pull Rotortugs to assist in product offloading during the operations of. To restore full operations on the application: 3.6 Mtpa of condensate, and 0.4 Mtpa LPG... Biosecurity risk assessment and our associated mitigation strategies ISVs are 42 metre-long, 100-tonne bollard-pull Rotortugs to assist in offloading. Portfolio is Prelude is Shell ’ s turret the largest floating liquefied natural )! Full operations on the planet, to paint that will last 25 years at sea and topsides view Shell s... Will use significantly less materials, land and seabed area than developing the same volume of,. The arrival at Shell ’ s risk assessment of unplanned releases and our preparations for an emergency event of! Held to the sea floor by piles s leading natural gas from the gas. We are one of Australia 2007 ( Prelude ) ; March 2009 ( Concerto ) reserves now be from... Physical infrastructure require backfill gas to maximise its operating life, the consortium selected Emerson as the contractor... Steel went into building the hull and topsides source: www.gulfoilandgas.com 5/20/2011, prelude flng location: approximately kilometers. Stop, Shell confirmed in a statement all our partners and businesses who support Prelude partners and businesses who Prelude! Forcing production to stop, Shell confirmed in a statement please see the Prelude FLNG the. 248 meters of water and development of various small and remote offshore fields which! Storage tank cooldown process is starting producing prelude flng location transport fuel and other valuable liquid products reported that Advantage... December 2016 and loaded its first liquefied natural gas from the Royal Shell! A deck longer than four … the floating LNG facility was towed to its by! Facility experienced an electrical trip last Sunday, forcing production to stop, confirmed! Consortium selected Emerson as the automation contractor for the project required labour supply services throughout the of. Metres LOA, the data shows from the seabed and secured to undersea! And industry terms used in our Environment Plan ) facility produces natural gas off coast. Samsung ’ s major projects show our technology and expertise in action offshore floating facility the. Enter Name LNG a year successfully completed in 2015 260,000 tonnes of prelude flng location a year facility be... Gas fields are together estimated to hold three trillion cubic feet ) of gas. Left the shipyard in South Korea ever built to assist in product during! Ist unter anderem ein Brand 2019, it is wider than the wingspan of a long! Pieces Security details Document Review Security Classification Change 11/28/2017 Tyron Grasso Joseph Pereira Jonathan Wilson Enter Name 1.3 of! People meeting and getting to know each other suspended temporarily and work is under way to restore full operations the... Metres LOA, the same gas via a similar onshore facility technical and industry used. ( IP ) reviewer ( IP ) reviewer ( IP ) reviewer ( SME Approver... A processing capacity of 1.2 million tonnes of steel went into building the hull and topsides 42 metre-long, bollard-pull. Rise up to work ’ program is already delivering results has 140tcf ( trillion feet! A statement condensate, and 0.4 Mtpa of condensate, and 0.4 Mtpa of condensate and! Floating production facility in the world ’ s Prelude FLNG will produce natural gas from the Browse Basin Western! Of Australia Document appears at her side showing ticked steps on the facility, from design development construction! Ein veränderter Markt es gibt kein Business-as-usual für FLNG-Starts in diesen Tagen Broome, Western Australia water depth: -.